¡@¡nMethod Introduction
 
  Method Introduction¡G
 
  1. A unique way to lift and install steel pillar.
  2. It consists mainly of adjustment frame, False piller, underwater pillar adjustment devices, etc.
  3. It can greatly improve the accuracy and precision of traditional way to install steel pillar.
  4. This method has been proven efficient and patented.
  5. Measurement of sludge depth, installation of Tremie pipe and circulation devices.

 
  Pillar adjustment device- Underwater jack¡G
 
 